top of page

Frequently Asked Questions

Answers from a licensed architect (OAA) — the questions clients ask us most about design, the design process, and building permits in Ontario.

 

Working with an architect

 

Do I need a licensed architect for my project, or can a designer do it?

It depends on the size and type of building. In Ontario, who may prepare permit drawings is set by the Building Code: smaller residential projects can be drawn by a qualified BCIN designer, while larger or more complex homes, multi-unit buildings, and nearly all commercial and industrial projects must be prepared by a licensed architect. Even when an architect is not legally required, most clients choose one for the design quality, code knowledge, and end-to-end handling of the permit process. If you're not sure which your project needs, a free consultation will settle it.

 

What does an architect actually do? What is included in architectural services?

An architect takes a project from idea to approved permit and beyond: feasibility and zoning review, concept design, design development, the full permit and construction drawing set, submission to the municipality, answering the plans examiner's comments, and support during construction. At Metani, that means one accountable professional handling design, permits, and coordination with engineers and the city — rather than you juggling each piece yourself.

 

What is the design process, step by step?

Five stages: (1) Consultation — we review your property, zoning, goals, and budget. (2) Concept design — the design direction and layout. (3) Permit drawings — a complete, code-compliant drawing package. (4) Municipal approval — we submit and respond to examiner comments until the permit is issued. (5) Construction support — we stay involved while it's built. Every project at Metani follows this path, whether it's a home addition or an industrial building.

 

How much does an architect cost in Ontario?

Fees depend on the project's size, complexity, and how much of the process you want handled — a permit drawing set for an addition is very different from full design services for a custom home or a commercial building. After a free consultation and a look at your property and plans, we quote a clear fixed fee before any work begins, so there are no surprises. Beware of comparing on price alone: incomplete drawings that bounce back from the city cost far more in delays than they save in fees.

 

Why hire an OAA-licensed architect instead of an unlicensed designer?

A licensed architect in Ontario is regulated by the Ontario Association of Architects (OAA): licensed, insured, and accountable to a professional standard. For many buildings an architect is a legal requirement, not a preference. Beyond that, municipalities expect professionally prepared drawings — a complete, code-compliant submission is the single biggest factor in getting a permit approved quickly.

 

Building permits

 

Do I need a building permit for my project?

Usually yes if you are building something new, adding to or altering a structure, changing a building's use, finishing a basement, adding a second suite, building a deck above a certain height, or doing a commercial fit-out. Cosmetic work — painting, flooring, replacing cabinets without moving plumbing or walls — generally does not need a permit. The rule of thumb: if it changes the structure, the plumbing, the use, or the footprint, assume a permit is required and ask before you build. Our free Ontario Building Permit Checklist (on the Building Permits page) walks through the full list.

 

How long does it take to get a building permit?

Once a complete application is accepted, straightforward residential permits in GTA municipalities are commonly reviewed within a few weeks — but the honest answer is that timelines vary by city, season, and project complexity, and most applications go through at least one round of examiner comments. The biggest delay is almost never the city: it's incomplete drawings. A complete, code-compliant first submission is the most reliable way to keep your permit on schedule.

 

What drawings and documents do I need for a building permit?

Typically: a survey-based site plan, floor plans, elevations, sections, and construction details, plus supporting items such as structural design, an energy-efficiency summary, and grading information for larger projects — the exact list depends on the project and municipality. Preparing this package completely and correctly is the core of what we do, and it's what our permit checklist itemizes for you.

 

Can I prepare my own permit drawings?

Ontario allows homeowners to prepare drawings for some simple work on their own home. In practice, anything structural — a new home, an addition, a second storey, a second suite — is expected to be professionally prepared, and examiner comments on homeowner drawings often add months. For commercial and industrial work, drawings must be prepared by a licensed professional. Most clients find a professional set pays for itself in a faster approval.

 

What is a minor variance, and will I need one?

If your design doesn't fully comply with the zoning by-law — setbacks, height, lot coverage — you may need a minor variance from your municipality's Committee of Adjustment before a permit can be issued. It's a separate application with its own hearing, and it adds time, which is why we check zoning first, before design begins, and prepare the variance application when one is genuinely needed.

 

Are second suites (basement apartments) legal in Ontario?

Generally yes — provincial rules encourage additional residential units, and most GTA municipalities allow second suites in detached, semi-detached, and townhouse homes. Legal doesn't mean permit-free, though: the suite still needs a building permit and must meet Building Code and fire-safety requirements for things like fire separation, exits, and alarms. We design second suites and prepare the permit package so the unit is legal, safe, and insurable.

 

Do commercial fit-outs and tenant improvements need a permit?

Almost always, yes. Opening a retail store, restaurant, office, or clinic in an existing space — or changing how a space is used — typically requires a building permit with professionally prepared drawings, and often landlord and site-plan considerations as well. We handle commercial and industrial permit work from design through approval, including coordination with the municipality.

 

Getting started

 

Which areas do you serve, and how do we start?

We serve clients across the Greater Toronto Area and Ontario — including Toronto, Vaughan, Markham, Richmond Hill, Newmarket, Aurora, and Mississauga. Starting is simple: book a free consultation through the Contact page or call (647) 877-9413. We'll review your property and zoning, talk through your goals and budget, and give you a clear fixed-fee quote and next steps — no obligation.

 

Still have a question? Call (647) 877-9413 or email info@metani.ca for a free consultation.

Servicing the Greater Toronto Area and Ontario.

bottom of page